6 March 2026
Considering the growing population in the Pimple Saudagar area and the difficulties faced by the citizens, he met Pimpri-Chinchwad Police Commissioner Vinoy Chaubey and submitted a representation regarding providing the necessary space to start a separate police station. Currently, the citizens of the area have to go to Sangvi Police Station for various police work. Due to distance, time and increasing crowd, the citizens are facing a lot of trouble. Therefore, starting a separate police station in Pimple Saudagar is the need of the hour. BJP City President and Corporator Hon. Shri. Shatrughan (Bapu) Kate along with Associate Corporator Hon. Anitatai Sandeep Kate are following up on this issue, and the Commissioner has shown a positive stance in this regard and assured that a proper decision will be taken soon. (Pimple Saudagar police station demand PCMC Vinoy Choubey public safety civic issue Pune infrastructure policing demand)
27 March 2026
Representation to the Commissioner to open a post office at Pimple Saudagar The way has been paved for opening a new post office here due to the support of MLA of Chinchwad Assembly Constituency Hon. Shri. Shankarbhau Jagtap, so that various postal services of the department can be made available to the citizens of Pimple Saudagar area at the local level. In this regard, a representation was made to Pimpri Chinchwad Municipal Corporation Commissioner Shravan Hardikar today demanding the immediate provision of basic facilities such as providing the necessary municipal land for starting a post office, completing the lease agreement process, arranging toilets, installing shutters, repairing windows and painting. This follow-up is underway with the cooperation of the ward corporator and BJP city president, Hon. Mr. Shatrughan (Bapu) Kate and corporator Hon. Anitatai Sandeep Kate, to ensure that the citizens of Pimple Saudagar area get post office facilities as soon as possible. It is believed that soon postal services, savings schemes, parcel services, and various government services will be available at the local level to the citizens of Pimple Saudagar area.
09 March 2026
At Vishwashanti Colony No. 5, citizens were facing severe inconvenience due to a blocked drainage line. As soon as the issue was reported, the concerned PCMC department was contacted immediately and the drainage blockage was cleared, bringing relief to local residents. Corporator Mrs. Kundatai Sanjay Bhise remains committed to resolving citizens’ issues promptly, and with the support of Mr. Shatrughna (Bapu) Kate and Mrs. Anitatai Sandeep Kate, continuous efforts are being made in public service.
04 March 2026
Instructions were issued to install a total of 4 speed breakers near PIKES International School on Jarvari Road and Yash Sankul Road, considering the increasing movement of students and citizens to strengthen road safety. The issue is being resolved with the support of Mr. Shatrughna (Bapu) Kate and Mrs. Anitatai Sandeep Kate.
25 February 2026
A complaint was received regarding damaged paver blocks on the footpath in the Kate Vasti Road area developed under the Smart City scheme. A site visit and inspection were conducted. Clear instructions were given to immediately repair the uprooted and broken paver blocks so that citizens do not face inconvenience and the work is completed quickly with quality.
25 February 2026
Road asphalting work has officially started at Londhe Corner, Pimple Saudagar. Due to persistent follow-up by the local representatives, the work has finally been initiated. The road condition had deteriorated badly with potholes, broken asphalt, and muddy patches during monsoon, causing major inconvenience to daily commuters, students, senior citizens, and two-wheeler riders. This work will now provide safer and smoother travel.
23 February 2026
The road work pending for the last 3 years at Vishwashanti Colony No. 06 has finally gained momentum and is now progressing. This is an important step toward improving basic infrastructure and removing daily commuting difficulties faced by residents. The work was expedited through continuous follow-up by the local representatives.
16 February 2026
After receiving complaints regarding water supply issues from residents of Kundan Estate Society, a direct meeting was organized with the concerned PCMC water supply officials. Residents shared their concerns, and detailed discussions were held regarding ensuring regular water supply, smooth flow, and proper pressure. Officials were instructed to take immediate action.
13 February 2026
A detailed inspection of the ongoing 18-meter-wide road concreting project at Zinjurde Mala was carried out. The progress of work, materials used, construction quality, drainage arrangements, and possible inconvenience to citizens were discussed thoroughly with officials. Clear instructions were issued to ensure timely and high-quality completion.
10 February 2026
Immediate cognizance was taken after receiving a complaint regarding the chamber cover, pipeline, and dumped debris near the entrance of Saipal Society in Pimple Saudagar. Representatives visited the spot, contacted the concerned officials immediately, and ensured appropriate action was taken.
08 February 2026
As part of a social initiative at Greenland Society, dustbins and EV charging points were made available for the convenience of residents. The main objective of the initiative is to promote cleanliness, eco-friendly habits, and basic facilities for citizens, making everyday life easier for society residents.
03 February 2026
A marathon review meeting and on-site inspection tour were conducted to review the ongoing development works in Ward 28 (Pimple Saudagar–Rahatani). Strict instructions were given to the civic administration regarding delays, work quality, and pending projects, emphasizing timely completion of all promised works.
05 February 2026
Beautification work of junctions in the Pimple Saudagar area is progressing steadily. Colorful flowering plants and ornamental shrubs are being planted to make the surroundings more attractive, clean, and eco-friendly, while also helping reduce pollution and improve greenery.
03 February 2026
A separate marathon review meeting was held to speed up development works in Ward 28. The civic administration was clearly instructed to complete all works within the defined deadline and maintain quality standards.
27 January 2026
Strong anti-encroachment action was carried out in the Pimple Saudagar area. Illegal hawker encroachments on footpaths near Shivar Chowk, Kokane Chowk, Govind-Yashada Chowk, Kunal Icon Road, and the Linear Garden were causing obstruction to pedestrians and traffic. Legal action was taken to restore public safety and order.
27 January 2026
Beautification work has started at various junctions in Pimple Saudagar. Colorful flowering plants and ornamental shrubs are being planted to make the area cleaner, greener, and more attractive. Citizens have welcomed this initiative and appreciated the efforts of the civic body and local representatives.


